East India Elevators Limited

Nuclear Power Project – Rawat Bhatta

Nuclear Power Corporation of India Limited

EAST INDIA ELEVATORS LTD. executed the installation of multiple passenger-cum-goods elevator systems with capacities up to 1000 kg at the NPCIL nuclear power facility. These elevators serve critical vertical transport needs across various plant levels, supporting both personnel movement and logistics operations within one of India’s landmark nuclear power sites.

The Rawatbhata site, also known as the Rajasthan Atomic Power Station (RAPS), holds historic significance as one of India’s earliest and largest nuclear power projects. The first pressurized heavy water reactor (PHWR) at Rawatbhata achieved sustained nuclear fission in the early 1970s, marking a pivotal moment in India’s indigenous nuclear power programme. Over subsequent decades, the facility has expanded to include multiple PHWR units with a combined electrical capacity of over 1,180 MW, with continued expansion including advanced 700 MW reactors contributing to India’s strategic energy goals.

Key Features

  • Versatile Vertical Transport: Passenger-cum-goods elevators designed to carry personnel, equipment, and materials up to 1000 kg, addressing the dual requirements of operational flexibility and safety within the complex plant environment.
  • Tailored for Nuclear Facility Use: Lift systems engineered and installed to integrate seamlessly with plant infrastructure while meeting stringent safety, reliability, and performance criteria essential in a nuclear site setting.
  • Extended Service Capability: Elevators positioned to support multi-level accessibility across reactor buildings and auxiliary structures, facilitating efficient workflow and operations within high-security zones.
  • Operational Continuity: Robust design and installation practices ensuring dependable performance under heavy usage cycles, contributing to uninterrupted facility access and operational continuity.
  • Compliance & Safety: All installations were executed in alignment with applicable industrial and safety standards, reflecting our commitment to quality and adherence to regulatory requirements for nuclear installations.

Impact

The elevator installations at NPCIL strengthen vertical accessibility and operational efficiency across one of India’s foundational nuclear power stations. By delivering reliable, high-capacity passenger-cum-goods lift solutions, EAST INDIA ELEVATORS LTD. supports NPCIL’s mission of maintaining safe, dependable plant operations  reinforcing our capability to serve technically demanding, mission-critical industrial environments.

01
Step

Design and Planning

All the Lorem Ipsum generators on the Internet tend to repeat predefined.
02
Step

Component Sourcing

Ority have suffered alteration in some randomised words which don't look.
03
Step

Testing and Quality

All the Lorem Ipsum generators on the Internet tend to repeat predefined.
04
Step

Final Assembly

Handful model sentence structures generate which looks reasonable.

Working Process

Demoralized voluptatum deleniti atque corrupti dolores quas molestias excepturi sint occaecati.

“Proactively envisioned multimedia based expertise and cross-media growth
strategies. Seamlessly visualize quality intellectual capital without superior.”

- John Henry

Prepare Documentation
Brand Consistency
Quality Control System
Prepare Documentation
Brand Consistency
Quality Control System

Project Information

Nuclear Power Corporation of India Limited

Client Name

NPCIL

Location

India

System Type

Passenger-cum-Goods Elevators

Capacity

Up to 1000 kg

Completion

Timeline

Budget

$20,00,500

Social Links

Completely synergize resource taxing.

Have a
project in
mind?